Project Project Management for Results



Management
for Results


                                                                                     Earn 35 PDUs
                                                                                     and 30 CPE
                                                                                     Credits!


October 4–8, 2010 | Arlington, VA                                                    Complete
Featuring Two Interactive Forums:                                                    Your Project
Project Management for Results               Earned Value Management                 on Time,
Ì   Initiate, Plan, Execute and Close out
    a Program
                                             Ì   Understand and Use EVM Tools
                                                 and Techniques
                                                                                     Within
Ì   Track and Manage Projects with           Ì   Forecast Final Program Costs and    Budget
    Greater Accuracy                             Scheduling Using EVM Methods
Ì   Master the Process of Closing and        Ì   Visualize and Plan Project          and to the
    Executing Projects                           Activities Using a Work
                                                 Breakdown Structure
                                                                                     Customer’s
Ì   Describe the Organizational Influences
    that May Affect Your Project             Ì   Understand the Project Life Cycle   Expectations

In Association with:


                          ®                                           www.ASMIweb.com/PMR2010 1
                                                                          www.ASMIweb.com/PMR2010
u
Project Management for Results
                                          day one:

                                          October 4, 2010
                                          8:30                                           1:00
                                          Registration & Continental Breakfast
                                                                                         Project Initiation Phase
                                          9:00                                           Ì Implement key stakeholder techniques for
                                                                                           the first customer/sponsor meetings
                                          Introduction to Project Management:
                                          The Latest Methodologies in                    Ì Identify and describe project requirements
                                                                                           in clear terms
                                          Project Management According to
                                          the PMBOK®
                                          Ì Describe the differences between             Project Organization Phase
                                            operations, projects and programs            Ì Align project team requirements
                                          Ì Define roles, review the necessary skills      with current organizational structure
                                            of project managers and identify possible      and standards
                                            competency gaps                              Ì Define roles and develop necessary skills to
                                                                                           effectively deliver on planned objectives

                                          Review the Terminology: Understand
                                          Key Concepts and Terms                         Creating the Project Charter
                                          Ì Review key project management                Ì Review criteria to determine exactly what is
                                            terminology as it relates to the PMBOK®        needed in the project charter documents
                                            and project management methodology           Ì Utilize best-in-class techniques for
                                          Ì Differentiate the various roles and            executing a project charter with full
                                            responsibilities of project stakeholders       sponsor’s approval


                                                                                         4:00
                                          Develop Project Management Skills
                                                                                         Day One Adjourns
                                          for Success
                                          Ì Utilize various methods to enhance project
                                            team building
                                          Ì Understand the key organizational
                                            influences that may affect a project


                                          12:00
                                          Lunch Break




                                 who should attend:
                                 Ì Project Mangers                                       Ì Procurement Manager
                                 Ì Portfolio Managers                                    Ì Acquisition and Procurement Staff
                                 Ì Program Managers                                      Ì IT Architects
                                 Ì PMPs                                                  Ì IT Specialist
                                 Ì Project Support Staff                                 Ì CAPMs
                                 Ì Program Analyst                                       Ì Contract Managers


    2                            www.ASMIweb.com/PMR2010
u
                                                                                                                 Project Management for Results
         day two:

        October 5, 2010
         8:30                                           1:00
         Registration & Continental Breakfast
                                                        Use the Work Breakdown Structure for
                                                        Effective Estimating
         9:00
                                                        Ì Differentiate cost estimating and cost
         Key Techniques for Defining
                                                          budgeting
         a Project
                                                        Ì Develop an expected value process to
         Ì Understand and identify the components of      create a defensible contingency reserve
           a project description document
         Ì Create and describe the purpose of a
           project priority matrix                      Develop a Preliminary Schedule
                                                        Ì Create a network diagram and identify the
                                                          critical path
         Plan the Project Infrastructure
                                                        Ì Identify early and late schedules and
         Ì Determine the purpose of defining the          produce a preliminary Gantt Chart using
           project infrastructure                         this information
         Ì Develop quality standards based on project
           goals and contract requirements
                                                        Construct the Network Diagram
                                                        Ì Monitor project timing and resources and
         Visualize and Plan the Project Activities        manage the links between them
         Using a Work Breakdown Structure               Ì Establish then minimize realistic project
         Ì Understand the purpose of a Work               duration while maintaining overall cost and
           Breakdown Structure (WBS)                      design requirements
         Ì Create a WBS using two techniques
                                                        4:00
                                                        Day Two Adjourns
         12:00
         Lunch Break




top five reasons to attend:

 Successfully              Break project        Develop               Understand            Acquire the
 bring a project           work down into       project               critical factors      necessary units to
 from initiation to        meaningful tasks     performance           for reclaiming        sit for the PMP®
 execution                                      measurement           troubled projects     examination
                                                and reporting
                                                standards




                                                                                 www.ASMIweb.com/PMR2010                                 3
u
Project Management for Results
                                           day three:

                                           October 4, 2010
                                           8:30                                            1:00
                                           Registration & Continental Breakfast            Utilize and Load
                                                                                           Organizational Resources
                                           9:00                                            Ì Maintain and assign people, facility and
                                           Define Project Estimates                          equipment resources accordingly
                                           Ì Differentiate a contingency reserve and a     Ì Actively adjust loads and variable expenses
                                             management reserve                              and understand the difference between
                                           Ì Use your WBS to provide a more accurate         generic-and specific-level resources
                                             project estimate

                                                                                           Create the Project Budget
                                           Analyze the Network Diagram                     Ì Identify your costs and develop your own
                                           Ì Resolve project and program problems and        project budgeting process
                                             make decisions                                Ì Create a baseline to determine if the
                                           Ì Establish then minimize realistic project       project is on track and help chart the project
                                             duration while maintaining overall cost and     and progress
                                             design requirements

                                                                                           Optimize the Project Plan
                                           Manage Project Progress: Integrating            Ì Develop key strategies for creating and
                                           the Gantt Chart                                   optimizing the project plan
                                           Ì Graphically document, manage and              Ì Manage project status and anticipate
                                             monitor project progress to effectively         problems that can hurt project progress
                                             minimize setbacks
                                           Ì Maintain project scope and take corrective    4:00
                                             action to get projects back on course         Day Three Adjourns



                                           12:00
                                           Lunch Break




                                 key methodologies covered
                                 The project management process described in this course enables project managers to produce project deliverables
                                 in the least amount of time, for the lowest cost and with the highest quality. Developed from the Project
                                 Management Body of Knowledge (PMBOK) produced by The Project Management Institute, this course teaches
                                 project managers to develop specific goals, objectives and deliverables to control the elements of projects.




    4                            www.ASMIweb.com/PMR2010
u
                                                                                                                 Earned Value Management
day four:

October 7, 2010
8:30                                               1:00
Registration & Continental Breakfast               Assemble the Project Team
                                                   Ì Assess project human capital needs
9:00                                                  and negotiate staff assignments with
Identify Risks                                       senior leadership
Ì Identify and evaluate project risk               Ì Lead exercises that promote overall
                                                     team success
Ì Identify specific risks by project and by work
  package or activity
                                                   Understand the Project Manager’s
Utilize Risk Analysis Techniques                   Role in Team Development
Ì Determine how risk management will be            Ì Overcome the many challenges to being an
    executed, who will be involved and the           effective project leader
    precise techniques to use                      Ì Strengthen your leadership skills by
Ì Objectively analyze the probability and            assessing, developing and advancing
  impact of each possible risk                       management capabilities


Design a Risk Management Plan                      Report Project Status
Ì Create risk management plan to ensure            Ì Record and report project status using
  successful project execution                       different methods

Ì Analyze, control, and mitigate risks using       Ì Ensure data accuracy when giving real
  this effective tool                                project status reports


                                                   4:00
12:00                                              Day Four Adjourns
Lunch Break




“
Very interesting combination of system and
strategy. Real demonstration of how to.”
                                                                       Teri B., Regional Project Manager, USDA


                                                                               www.ASMIweb.com/PMR2010                             5
u
Earned Value Management
                                 day five:

                                 October 8, 2010
                                 8:30                                           1:00
                                 Registration & Continental Breakfast           Monitor and Control Project Processes
                                                                                Ì Utilize proper measures and metrics to
                                 9:00                                             gauge project processes
                                 Deal with Change                               Ì Effectively report project processes and
                                 Ì Manage and communicate project change          make enhancements
                                 Ì Create a change management system to
                                   avoid confusion and keep your projects
                                   on track
                                                                                Execute the Project Closeout Phase
                                                                                Ì Name the three steps to closing out a
                                                                                  project and several choices for project
                                 Establish Change Management                      closeout activities
                                 Control Procedures                             Ì Conduct a project closeout review
                                 Ì Initiate a change management process
                                   within your project
                                                                                Document Lessons Learned
                                 Ì Enhance project team success through
                                   effective change initiatives                 Ì Document project successes and
                                                                                  improvements
                                                                                Ì Implement a system to ensure data and
                                 Adjust the Scope for                             metrics for further projects
                                 Schedule Changes
                                 Ì Schedule changes that can uncontrollably     4:00
                                   alter the project scope                      Conference Adjourns

                                 Ì Keep your project within scope and on time
                                   using best practices

                                 12:00
                                 Lunch Break




   6
                          “      Logical and easy-to-follow
                                  presentation.”
                          www.ASMIweb.com/PMR2010
                                                                                                                 Tom W., True MFG
Logistics & Registration
           venue and hotel:                                                         CPE Credits
           Project Management for Results will be hosted at The                                          Delivery Method: Group-live
           Performance Institute’s training center in Arlington, VA, just one                            Program Level: Basic
           block east of the Courthouse stop on the Orange Line of the                                   Prerequisites: None
           D.C. Metro. A public parking garage is located inside of the                                  Advanced Preparation: None
           building for $10/day. Continental breakfast and refreshments                                  CPE Credits: Up to 30
           will be provided for delegates on each day.                              The American Strategic Management Institute (ASMI) is registered with the National
                                                                                    Association of State Boards of Accountancy (NASBA) as a sponsor of continuing
           The Performance Institute Training Center                                professional education on the National Registry of CPE Sponsors. State boards of
                                                                                    accountancy have final authority on the acceptance of individual courses for CPE credit.
           1515 N. Courthouse Road, Sixth Floor                                     Complaints regarding sponsors may be addressed to the National Registry of CPE
           Arlington, VA 22201                                                      Sponsors, 150 Fourth Avenue North, Nashville, TN 37219-2417. Website: www.nasba.org.
           877-992-9522
           A limited number of rooms have been reserved at the                      PDUs
           Arlington Rosslyn Courtyard by Marriott at the prevailing
                                                                                                                     PDU Credits: Up to 35
           rate of $300.00 until September 3, 2010. Please call the hotel
           directly and reference code “Project Management for Results”                                              As a PMI Registered Education Provider (R.E.P), The
           when making reservations to get the discounted rate. The             ®                                    Performance Institute has agreed to abide by PMI
                                                                                                                     established quality assurance criteria. “PMI” and
           hotel is conveniently located three blocks from the Rosslyn              the PMI logo are service and trademarks registered in the United States and other
           Metro station. Please ask the hotel about a complimentary                nations; “PMP” is a certification mark registered in the United States and other nations;
                                                                                    “PMBOK” and “CAPM” are trademarks registered in the United States and other
           shuttle that is also available for your convenience.                     nations by the Project Management Institute, Inc., which is not affiliated with The
                                                                                    Performance Institute. Earning PMI Credits: The Performance Institute is a Registered
           Arlington Rosslyn Courtyard by Marriott                                  Education Provider of The Project Management Institute. All of our project management
           1533 Clarendon Blvd.                                                     trainings, conferences and webinars offer credits to help you take the PMP Exam or stay
                                                                                    accredited with PMI.
           Arlington, VA 22209
           703-528-2222
           www.courtyardarlingtonrosslyn.com                                        Quality Assurance:

                                                                                    The American Strategic Management Institute (ASMI) strives to provide you with the
           tuition & group discounts:                                               most productive and effective educational experience possible. If after completing the
                                                                                    course you feel there is some way we can improve, please write your comments on
           The tuition rate for attending Project Management for Results            the evaluation form provided upon your arrival. Should you feel dissatisfied with your
                                                                                    learning experience and wish to request a credit or refund, please submit it in writing
           is as follows:                                                           no later than 10 business days after the end of the training to:

            Offerings                  Public       Private        PDUs             ASMI: Quality Assurance
                                                                                    805 15th Street, NW, 3rd Floor
            Full Project                                                            Washington, DC 20005
            Management                  $1899        $2199           35             Note: As speakers are confirmed six months before the event, some speaker
            for Results Week                                                        changes or topic changes may occur in the program. The Institute is not responsible
                                                                                    for speaker changes, but will work to ensure a comparable speaker is located to
            Project Management                                                      participate in the program.
                                        $1299        $1399           21
            for Results (3 Days)                                                    If for any reason The Institute decides to cancel this conference, The Institute accepts
                                                                                    no responsibility for covering airfare, hotel or other costs incurred by registrants,
            Earned Value
                                        $899          $999           14             including delegates, sponsors and guests.
            Management
                                                                                    Discounts & Payment:
                                                                                    • All ‘Early Bird’ Discounts must require payment at time of registration and before the
           * For more information on group discounts for Project                      cut-off date in order to receive any discount.
             Management for Results please contact Melvin Hall at                   • Any discounts offered whether by The Institute (including team discounts) must also
             202-739-9630 or email him at                                             require payment at the time of registration.

             Melvin.Hall@ASMIweb.com.                                               • All discount offers cannot be combined with any      other offer.
                                                                                    • Discounts cannot be applied retroactively

                                                                                Payment must be secured prior to the conference. If payment is not received by the
                                                                                conference start date, a method of payment must be presented at the time of registration in
                                                                                order to guarantee your participation at the event.




PMP® exam voucher: $600
If you plan on taking the PMP Exam, you may purchase a voucher from The Performance Institute for $600. The benefits of purchasing the
voucher from The Institute are:
Ì   No out-of-pocket expense to register for the exam
Ì   All costs associated with PMP certification included on one invoice
Ì   Add all PMP certification expenses to the cost of this training

                                                                                                                        www.ASMIweb.com/PMR2010                                 7
Logistics & Registration
    to register u
               call                             fax this form to                          visit
               877-992-9522                     866-234-0680                              www.ASMIweb.com/PMR2010


     Registration Form
     o Yes! Register me for Full Project Management for Results Week
     o Please register me for Project Management for Results only
     o Please register me for Earned Value Management only
     o Please call me. I am interested in a special Group Discount for my team


     Delegate Information


     Name                                                               Title




     Organization                                           Dept.




     Address




     City                                                               State                                      Zip




     Telephone                                              Fax




     Email


     Payment Information
     o Check          o Purchase Order / Training Form              o Credit Card



     Credit Card Number                                                 Expiration Date                                       Verification no.




     Name on Card                                                       Billing Zip


     Please make checks payable to: The Performance Institute


     CAnCELLATIOn POLICY: The American Strategic Management Institute (ASMI) will provide a full refund less a $399 administration
     fee for cancellations requested four weeks prior to the event start date unless cancellation occurs within two weeks prior to the event
     start date. If a cancellation is requested less than two weeks prior to the event start date, no refund will be issued. Registrants who fail
     to attend and do not cancel prior to the event will be charged the entire registration fee. All cancellations must be requested through
     the cancellation link found in your attendance confirmation email. Please note that cancellation is not final until you receive a cancella-
     tion confirmation email.

     o I have read and accepted the Cancellation Policy above.

     ACKnOWLEDGED AnD AGREED

     By: _________________________________________________________________________________Date: _______________________________________
                                                                                                                Priority Code: T355-WEB


8   www.ASMIweb.com/PMR2010

More Related Content

What's hot (18)

T347 Asm Iweb
T347 Asm IwebT347 Asm Iweb
T347 Asm Iweb
 
T347 Asm Iweb
T347 Asm IwebT347 Asm Iweb
T347 Asm Iweb
 
T343
T343T343
T343
 
T349 Pi Web
T349 Pi WebT349 Pi Web
T349 Pi Web
 
T349 Pi Web
T349 Pi WebT349 Pi Web
T349 Pi Web
 
T343
T343T343
T343
 
T350
T350T350
T350
 
IM04 - BI Project Management
IM04 - BI Project ManagementIM04 - BI Project Management
IM04 - BI Project Management
 
T348 P Iweb
T348 P IwebT348 P Iweb
T348 P Iweb
 
High Performance Project Management - A Holistic Approach
High Performance Project Management - A Holistic ApproachHigh Performance Project Management - A Holistic Approach
High Performance Project Management - A Holistic Approach
 
Presentation schaden
Presentation schadenPresentation schaden
Presentation schaden
 
T353 Web Asmi
T353 Web AsmiT353 Web Asmi
T353 Web Asmi
 
T344
T344T344
T344
 
T344 Web
T344 WebT344 Web
T344 Web
 
Romeo.mitchell
Romeo.mitchellRomeo.mitchell
Romeo.mitchell
 
T359
T359T359
T359
 
George Jucan: Using PMCDF to Advance One's Career
George Jucan: Using PMCDF to Advance One's CareerGeorge Jucan: Using PMCDF to Advance One's Career
George Jucan: Using PMCDF to Advance One's Career
 
PRINCE2 Process Model
PRINCE2 Process ModelPRINCE2 Process Model
PRINCE2 Process Model
 

Similar to T355 (20)

T355 p iweb
T355 p iwebT355 p iweb
T355 p iweb
 
T348 Asm Iweb
T348 Asm IwebT348 Asm Iweb
T348 Asm Iweb
 
T349
T349T349
T349
 
T328
T328T328
T328
 
T349
T349T349
T349
 
T347
T347T347
T347
 
T347 P Iweb
T347 P IwebT347 P Iweb
T347 P Iweb
 
T335 Web
T335 WebT335 Web
T335 Web
 
T328
T328T328
T328
 
T328
T328T328
T328
 
T335asmi
T335asmiT335asmi
T335asmi
 
T335 Asmiweb
T335 AsmiwebT335 Asmiweb
T335 Asmiweb
 
T335
T335T335
T335
 
T335
T335T335
T335
 
T356
T356T356
T356
 
T335 Web
T335 WebT335 Web
T335 Web
 
Business PMO & IT Pmo What Is The Difference
Business PMO & IT Pmo What Is The DifferenceBusiness PMO & IT Pmo What Is The Difference
Business PMO & IT Pmo What Is The Difference
 
T356 Asmi
T356 AsmiT356 Asmi
T356 Asmi
 
T359
T359T359
T359
 
Pmo
PmoPmo
Pmo
 

More from performanceweb (20)

Cheatsheet
CheatsheetCheatsheet
Cheatsheet
 
5 Deadly Workplace Legal Risks
5 Deadly Workplace Legal Risks5 Deadly Workplace Legal Risks
5 Deadly Workplace Legal Risks
 
T354
T354T354
T354
 
T354
T354T354
T354
 
T358
T358T358
T358
 
T354
T354T354
T354
 
T354 asmi
T354 asmiT354 asmi
T354 asmi
 
T358
T358T358
T358
 
P769
P769P769
P769
 
P769
P769P769
P769
 
E136
E136E136
E136
 
B331
B331B331
B331
 
P765
P765P765
P765
 
P765
P765P765
P765
 
P765
P765P765
P765
 
T354 pi
T354 piT354 pi
T354 pi
 
T354
T354T354
T354
 
B329
B329B329
B329
 
B316
B316B316
B316
 
T355
T355T355
T355
 

Recently uploaded

8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 

Recently uploaded (20)

8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Corporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information TechnologyCorporate Profile 47Billion Information Technology
Corporate Profile 47Billion Information Technology
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 

T355

  • 1. Project Project Management for Results Management for Results Earn 35 PDUs and 30 CPE Credits! October 4–8, 2010 | Arlington, VA Complete Featuring Two Interactive Forums: Your Project Project Management for Results Earned Value Management on Time, Ì Initiate, Plan, Execute and Close out a Program Ì Understand and Use EVM Tools and Techniques Within Ì Track and Manage Projects with Ì Forecast Final Program Costs and Budget Greater Accuracy Scheduling Using EVM Methods Ì Master the Process of Closing and Ì Visualize and Plan Project and to the Executing Projects Activities Using a Work Breakdown Structure Customer’s Ì Describe the Organizational Influences that May Affect Your Project Ì Understand the Project Life Cycle Expectations In Association with: ® www.ASMIweb.com/PMR2010 1 www.ASMIweb.com/PMR2010
  • 2. u Project Management for Results day one: October 4, 2010 8:30 1:00 Registration & Continental Breakfast Project Initiation Phase 9:00 Ì Implement key stakeholder techniques for the first customer/sponsor meetings Introduction to Project Management: The Latest Methodologies in Ì Identify and describe project requirements in clear terms Project Management According to the PMBOK® Ì Describe the differences between Project Organization Phase operations, projects and programs Ì Align project team requirements Ì Define roles, review the necessary skills with current organizational structure of project managers and identify possible and standards competency gaps Ì Define roles and develop necessary skills to effectively deliver on planned objectives Review the Terminology: Understand Key Concepts and Terms Creating the Project Charter Ì Review key project management Ì Review criteria to determine exactly what is terminology as it relates to the PMBOK® needed in the project charter documents and project management methodology Ì Utilize best-in-class techniques for Ì Differentiate the various roles and executing a project charter with full responsibilities of project stakeholders sponsor’s approval 4:00 Develop Project Management Skills Day One Adjourns for Success Ì Utilize various methods to enhance project team building Ì Understand the key organizational influences that may affect a project 12:00 Lunch Break who should attend: Ì Project Mangers Ì Procurement Manager Ì Portfolio Managers Ì Acquisition and Procurement Staff Ì Program Managers Ì IT Architects Ì PMPs Ì IT Specialist Ì Project Support Staff Ì CAPMs Ì Program Analyst Ì Contract Managers 2 www.ASMIweb.com/PMR2010
  • 3. u Project Management for Results day two: October 5, 2010 8:30 1:00 Registration & Continental Breakfast Use the Work Breakdown Structure for Effective Estimating 9:00 Ì Differentiate cost estimating and cost Key Techniques for Defining budgeting a Project Ì Develop an expected value process to Ì Understand and identify the components of create a defensible contingency reserve a project description document Ì Create and describe the purpose of a project priority matrix Develop a Preliminary Schedule Ì Create a network diagram and identify the critical path Plan the Project Infrastructure Ì Identify early and late schedules and Ì Determine the purpose of defining the produce a preliminary Gantt Chart using project infrastructure this information Ì Develop quality standards based on project goals and contract requirements Construct the Network Diagram Ì Monitor project timing and resources and Visualize and Plan the Project Activities manage the links between them Using a Work Breakdown Structure Ì Establish then minimize realistic project Ì Understand the purpose of a Work duration while maintaining overall cost and Breakdown Structure (WBS) design requirements Ì Create a WBS using two techniques 4:00 Day Two Adjourns 12:00 Lunch Break top five reasons to attend: Successfully Break project Develop Understand Acquire the bring a project work down into project critical factors necessary units to from initiation to meaningful tasks performance for reclaiming sit for the PMP® execution measurement troubled projects examination and reporting standards www.ASMIweb.com/PMR2010 3
  • 4. u Project Management for Results day three: October 4, 2010 8:30 1:00 Registration & Continental Breakfast Utilize and Load Organizational Resources 9:00 Ì Maintain and assign people, facility and Define Project Estimates equipment resources accordingly Ì Differentiate a contingency reserve and a Ì Actively adjust loads and variable expenses management reserve and understand the difference between Ì Use your WBS to provide a more accurate generic-and specific-level resources project estimate Create the Project Budget Analyze the Network Diagram Ì Identify your costs and develop your own Ì Resolve project and program problems and project budgeting process make decisions Ì Create a baseline to determine if the Ì Establish then minimize realistic project project is on track and help chart the project duration while maintaining overall cost and and progress design requirements Optimize the Project Plan Manage Project Progress: Integrating Ì Develop key strategies for creating and the Gantt Chart optimizing the project plan Ì Graphically document, manage and Ì Manage project status and anticipate monitor project progress to effectively problems that can hurt project progress minimize setbacks Ì Maintain project scope and take corrective 4:00 action to get projects back on course Day Three Adjourns 12:00 Lunch Break key methodologies covered The project management process described in this course enables project managers to produce project deliverables in the least amount of time, for the lowest cost and with the highest quality. Developed from the Project Management Body of Knowledge (PMBOK) produced by The Project Management Institute, this course teaches project managers to develop specific goals, objectives and deliverables to control the elements of projects. 4 www.ASMIweb.com/PMR2010
  • 5. u Earned Value Management day four: October 7, 2010 8:30 1:00 Registration & Continental Breakfast Assemble the Project Team Ì Assess project human capital needs 9:00 and negotiate staff assignments with Identify Risks senior leadership Ì Identify and evaluate project risk Ì Lead exercises that promote overall team success Ì Identify specific risks by project and by work package or activity Understand the Project Manager’s Utilize Risk Analysis Techniques Role in Team Development Ì Determine how risk management will be Ì Overcome the many challenges to being an executed, who will be involved and the effective project leader precise techniques to use Ì Strengthen your leadership skills by Ì Objectively analyze the probability and assessing, developing and advancing impact of each possible risk management capabilities Design a Risk Management Plan Report Project Status Ì Create risk management plan to ensure Ì Record and report project status using successful project execution different methods Ì Analyze, control, and mitigate risks using Ì Ensure data accuracy when giving real this effective tool project status reports 4:00 12:00 Day Four Adjourns Lunch Break “ Very interesting combination of system and strategy. Real demonstration of how to.” Teri B., Regional Project Manager, USDA www.ASMIweb.com/PMR2010 5
  • 6. u Earned Value Management day five: October 8, 2010 8:30 1:00 Registration & Continental Breakfast Monitor and Control Project Processes Ì Utilize proper measures and metrics to 9:00 gauge project processes Deal with Change Ì Effectively report project processes and Ì Manage and communicate project change make enhancements Ì Create a change management system to avoid confusion and keep your projects on track Execute the Project Closeout Phase Ì Name the three steps to closing out a project and several choices for project Establish Change Management closeout activities Control Procedures Ì Conduct a project closeout review Ì Initiate a change management process within your project Document Lessons Learned Ì Enhance project team success through effective change initiatives Ì Document project successes and improvements Ì Implement a system to ensure data and Adjust the Scope for metrics for further projects Schedule Changes Ì Schedule changes that can uncontrollably 4:00 alter the project scope Conference Adjourns Ì Keep your project within scope and on time using best practices 12:00 Lunch Break 6 “ Logical and easy-to-follow presentation.” www.ASMIweb.com/PMR2010 Tom W., True MFG
  • 7. Logistics & Registration venue and hotel: CPE Credits Project Management for Results will be hosted at The Delivery Method: Group-live Performance Institute’s training center in Arlington, VA, just one Program Level: Basic block east of the Courthouse stop on the Orange Line of the Prerequisites: None D.C. Metro. A public parking garage is located inside of the Advanced Preparation: None building for $10/day. Continental breakfast and refreshments CPE Credits: Up to 30 will be provided for delegates on each day. The American Strategic Management Institute (ASMI) is registered with the National Association of State Boards of Accountancy (NASBA) as a sponsor of continuing The Performance Institute Training Center professional education on the National Registry of CPE Sponsors. State boards of accountancy have final authority on the acceptance of individual courses for CPE credit. 1515 N. Courthouse Road, Sixth Floor Complaints regarding sponsors may be addressed to the National Registry of CPE Arlington, VA 22201 Sponsors, 150 Fourth Avenue North, Nashville, TN 37219-2417. Website: www.nasba.org. 877-992-9522 A limited number of rooms have been reserved at the PDUs Arlington Rosslyn Courtyard by Marriott at the prevailing PDU Credits: Up to 35 rate of $300.00 until September 3, 2010. Please call the hotel directly and reference code “Project Management for Results” As a PMI Registered Education Provider (R.E.P), The when making reservations to get the discounted rate. The ® Performance Institute has agreed to abide by PMI established quality assurance criteria. “PMI” and hotel is conveniently located three blocks from the Rosslyn the PMI logo are service and trademarks registered in the United States and other Metro station. Please ask the hotel about a complimentary nations; “PMP” is a certification mark registered in the United States and other nations; “PMBOK” and “CAPM” are trademarks registered in the United States and other shuttle that is also available for your convenience. nations by the Project Management Institute, Inc., which is not affiliated with The Performance Institute. Earning PMI Credits: The Performance Institute is a Registered Arlington Rosslyn Courtyard by Marriott Education Provider of The Project Management Institute. All of our project management 1533 Clarendon Blvd. trainings, conferences and webinars offer credits to help you take the PMP Exam or stay accredited with PMI. Arlington, VA 22209 703-528-2222 www.courtyardarlingtonrosslyn.com Quality Assurance: The American Strategic Management Institute (ASMI) strives to provide you with the tuition & group discounts: most productive and effective educational experience possible. If after completing the course you feel there is some way we can improve, please write your comments on The tuition rate for attending Project Management for Results the evaluation form provided upon your arrival. Should you feel dissatisfied with your learning experience and wish to request a credit or refund, please submit it in writing is as follows: no later than 10 business days after the end of the training to: Offerings Public Private PDUs ASMI: Quality Assurance 805 15th Street, NW, 3rd Floor Full Project Washington, DC 20005 Management $1899 $2199 35 Note: As speakers are confirmed six months before the event, some speaker for Results Week changes or topic changes may occur in the program. The Institute is not responsible for speaker changes, but will work to ensure a comparable speaker is located to Project Management participate in the program. $1299 $1399 21 for Results (3 Days) If for any reason The Institute decides to cancel this conference, The Institute accepts no responsibility for covering airfare, hotel or other costs incurred by registrants, Earned Value $899 $999 14 including delegates, sponsors and guests. Management Discounts & Payment: • All ‘Early Bird’ Discounts must require payment at time of registration and before the * For more information on group discounts for Project cut-off date in order to receive any discount. Management for Results please contact Melvin Hall at • Any discounts offered whether by The Institute (including team discounts) must also 202-739-9630 or email him at require payment at the time of registration. Melvin.Hall@ASMIweb.com. • All discount offers cannot be combined with any other offer. • Discounts cannot be applied retroactively Payment must be secured prior to the conference. If payment is not received by the conference start date, a method of payment must be presented at the time of registration in order to guarantee your participation at the event. PMP® exam voucher: $600 If you plan on taking the PMP Exam, you may purchase a voucher from The Performance Institute for $600. The benefits of purchasing the voucher from The Institute are: Ì No out-of-pocket expense to register for the exam Ì All costs associated with PMP certification included on one invoice Ì Add all PMP certification expenses to the cost of this training www.ASMIweb.com/PMR2010 7
  • 8. Logistics & Registration to register u call fax this form to visit 877-992-9522 866-234-0680 www.ASMIweb.com/PMR2010 Registration Form o Yes! Register me for Full Project Management for Results Week o Please register me for Project Management for Results only o Please register me for Earned Value Management only o Please call me. I am interested in a special Group Discount for my team Delegate Information Name Title Organization Dept. Address City State Zip Telephone Fax Email Payment Information o Check o Purchase Order / Training Form o Credit Card Credit Card Number Expiration Date Verification no. Name on Card Billing Zip Please make checks payable to: The Performance Institute CAnCELLATIOn POLICY: The American Strategic Management Institute (ASMI) will provide a full refund less a $399 administration fee for cancellations requested four weeks prior to the event start date unless cancellation occurs within two weeks prior to the event start date. If a cancellation is requested less than two weeks prior to the event start date, no refund will be issued. Registrants who fail to attend and do not cancel prior to the event will be charged the entire registration fee. All cancellations must be requested through the cancellation link found in your attendance confirmation email. Please note that cancellation is not final until you receive a cancella- tion confirmation email. o I have read and accepted the Cancellation Policy above. ACKnOWLEDGED AnD AGREED By: _________________________________________________________________________________Date: _______________________________________ Priority Code: T355-WEB 8 www.ASMIweb.com/PMR2010